1 2025-02-27 GMS Feedback points from Kiruba:
 1. Checkout person detail with time should be added
 2. A page with table to show the above details
 3. In issue Page - with product list add serial number
 4. If some items are deleted from roduct table it should be shown in another table
 5. Revoke inactive items with date, reason and approver name
 6. Calibration certificate upload
 7. There should be option to upload in later stage and give email remainder if calibration certificate is not upload within a week time
 8. Record of old certificate and filter it with year wise
 9. SAP interlink - study
No file Edit
7 2025-04-25 GMS Tamil had demo with Kiruba and team
 Following features need to be added in the tool.
 1. In product table one more coloumn need to be added \"Po code\"
 2. Few products will be maintained in stock, not used, those will be listed under stock and should not be showed in calid due record as well as issue/receive\"
 3. For each product type stock target quantity should be added, if target quantity is not met, then it should be shown
 4. For ring guage maintenance seperate logic should be inplemented.
 5. In issue receive one feild and column should be added \" temporary or permenant issue\". For temporary issue if the product is not returned within 3 days then it should be highlighted.
 6. For location sub-branch should be added
 7. In issue receive page OK/ Not OK should be added wirh REMARKS. Not OK product should be moved to inactive.